Fulhaus offers Airbnb furniture design and sourcing through Ludwig, its AI interior design platform. Its published furnishing tiers start at $8,000 per unit, with vendor-direct shipments and owner-managed assembly and placement. The service fits a property with an established room plan and an on-site team ready to receive and set up the selected products.
Fulhaus Design and Purchasing Scope
Ludwig accepts a property address, photos, a target average daily rate, and a style reference. Fulhaus describes a room-by-room design process that produces renders, a product list, an itemized budget, and delivery estimates for owner approval before ordering.
The Airbnb package covers furniture, lighting, art, rugs, linens, and kitchen smalls. Its room descriptions include living, sleeping, dining, and workspace areas; larger packages add features such as bunk rooms and outdoor lounge furniture. The approved product schedule determines quantities and selections for the actual property.
A complete Airbnb furnishing budget assigns a separate amount to each purchased service and each owner-managed task. For a Fulhaus project, retain the itemized product schedule alongside freight, tax, receiving, assembly, placement, and packaging-removal costs.
Fulhaus Published Furniture Package Pricing
Fulhaus's Airbnb package tier cards publish the following ranges. These company-listed ranges describe furnishing scope; the property-specific order and checkout determine the payable amounts, selected products, service fees, shipping, taxes, and surcharges.
| Property | Published package range | Listed scope |
|---|---|---|
| Studio or one bedroom | $8,000 to $14,000 | Bed, sofa, dining for two, workspace, kitchen smalls, art, lighting, and linens |
| Two-bedroom house or condo | $14,000 to $22,000 | Two bedrooms, living room, dining for four, workspace, entryway, bath refresh, kitchen smalls, and art |
| Three- to five-bedroom vacation home | $22,000 to $60,000 or more | Full-home scope with bunk rooms, outdoor lounge, larger dining, lighting, and art |
Package pricing scales with square footage, guest capacity, and target nightly rate. Fulhaus also describes repeatable product specifications and volume pricing beginning at five units for multi-property operators. A portfolio proposal needs a product and delivery schedule for each address.
The package tier is a planning range rather than a fixed installed-price tariff. Use the accepted quote in the calculator below. Enter each cost once: when a quote bundles furniture and design, put that combined amount in the furniture/package field and enter zero for separately billed design. Apply the same rule to included freight or tax. Use a single currency across all inputs; the calculator displays USD and performs no currency conversion.
Fulhaus Furnishing Budget Calculator
All starting amounts are hypothetical planning inputs, including the 10% contingency. Replace them with your quote and local labor budget. The calculator adds furniture/package cost, separately billed design or service charges, shipping, receiving and assembly, and quoted tax or other setup costs. Contingency applies to that entire subtotal. Ludwig software credits, construction, financing, operating reserves, and lost rental income are excluded; include photography and disposal in other setup costs when needed.
The hypothetical example totals $23,000 before contingency, adds a $2,300 allowance, and produces a $25,300 planning budget. The $2,500 receiving-and-assembly allowance belongs to local execution. Each proposal should assign that work to a named team and state whether storage, mounting, waste removal, and return visits are included.
Ludwig Software and Furniture Costs
Keep any software subscription or credit purchase in a separate budget line from the physical furniture order. Software access and render credits describe digital design use; the approved furniture order establishes the products, quantities, procurement charges, and delivery commitment. The calculator excludes software spending so its total remains a furnishing-and-setup budget.
Fulhaus Procurement and Order Responsibilities
Fulhaus's terms and conditions describe a software platform that connects users with third-party furniture vendors. Those vendors fulfill physical orders. Fulhaus coordinates ordering and tracking and acts as the contact for vendor warranty and return claims. The originating vendor's policies govern title, risk of loss, shipping, warranty, and eligible returns.
Displayed prices include the vendor product price and applicable Fulhaus service fees. Taxes, shipping, and surcharges are calculated at checkout. Keep the checkout record for each item, including its vendor, model, dimensions, finish, quantity, lead time, warranty, and return conditions. That record gives the receiving team a defined inspection and replacement reference.
Fulhaus Delivery and Assembly Terms
Products ship as they become available, creating multiple deliveries for a room. Fulhaus's shipping policy describes freight as typically curbside or front-door drop-off; some carriers deliver just inside the entryway. Carrier and regional arrangements determine the actual handoff. Fulhaus assigns assembly, installation, placement, and packaging removal to the owner or an on-site team.
The Airbnb landing page advertises a three-week delivery target, a render and line-item stage within five business days, and design and sourcing lasting five to seven business days. Its FAQ also allows two to four weeks for manufacturing and freight. The shipping policy gives made-to-order or out-of-stock upholstery a common lead time of four to twelve weeks. Build the installation calendar from each selected item's lead time and freight appointment.
Receiving work includes access measurements, elevator or loading-dock reservations, delivery attendance, and inspection. Boxed dimensions determine whether a product can pass through doors, stairs, and elevators. Schedule room placement and assembly after the required pieces arrive, and leave time for damage resolution before photography.
Fulhaus Damage Claims and Returns
Fulhaus's warranty and returns policy requires transit damage photographs and notice within 48 hours of delivery. A missing shipment must be reported within seven days of its last tracking update. Fulhaus administers claims with the carrier and originating vendor; the receiving team's photographs and delivery records support that process.
Change-of-mind return eligibility, return windows, restocking charges, and return freight follow the vendor's checkout terms. Custom-made and final-sale goods are nonreturnable. Cancellation requests go to the vendor before shipment, and made-to-order goods may become noncancellable when production begins. Refunds follow vendor receipt and inspection; service fees for completed design work are nonrefundable.
Fulhaus Project Fit and Handoff
Fulhaus's design-and-sourcing scope supports an owner who can manage the physical handoff locally. A written responsibility schedule should assign purchasing approval, substitutions, delivery attendance, damage reporting, storage, assembly, anchoring, placement, supply preparation, cleanup, and photography. Construction and utility work need their own trade scope and responsible contractor.
The same schedule makes Airbnb design company comparisons useful: compare the approved rooms, product quantities, purchasing terms, site labor, and acceptance records across proposals. A proposed installation service needs a task list covering assembly, mounting, packaging removal, and final placement.
Before authorizing a property-specific order, retain the approved render, measured layout, product schedule, total checkout amount, substitution approval process, and receiving plan. The completed handoff should reconcile the delivered inventory with that order and record outstanding replacements, warranty documents, care instructions, and final placement.
Fulhaus Order Acceptance Checklist
Approve a room-by-room bill of materials against the actual guest capacity. Record bed frames and mattresses separately, specify the number of linen changes and dining places, and list window coverings, lamps, and kitchen equipment individually. A room render alone leaves quantities, mattress inclusion, spare linens, mounting hardware, and cleaning supplies unresolved.
| Decision | Approval record | Handoff requirement |
|---|---|---|
| Product substitution | Model, finish, dimensions, price difference, and revised arrival estimate | Written owner approval before a replacement order |
| Access and assembly | Box dimensions, room measurements, assembly instructions, and local labor scope | Assigned receiver and installer for each delivery |
| Guest-ready completion | Installed inventory, missing-parts list, damage photographs, and outstanding replacements | Usable beds, seating, lighting, and kitchen equipment before photography and guest arrival |
Schedule photography after the last guest-critical item has arrived, passed inspection, and been assembled. Maintain a separate record for each shipment's tracking update and arrival date so the receiving team can act within the damage and non-arrival reporting windows. An acceptable substitute must meet the approved fit, function, and budget before the opening date moves forward.
Bottom line
Fulhaus combines Ludwig design output with coordinated furniture sourcing and vendor-direct purchasing. Its package ranges help define the furniture budget, while software credits, checkout charges, vendor terms, delivery lead times, and local setup responsibilities determine the complete project commitment. Choose a package around an approved room inventory and a staffed receiving-and-assembly plan, with enough schedule flexibility to handle separate shipments and replacements.